Murfreesboro & Rutherford County road projects: Aug. 1-8

Aug 02, 2021 at 08:00 am by Voice Wire


Old Pinnacle Building Demolition Work (N Maple at W College St.)

Expected No Lane Closures: Monday through Friday: Site construction work continues. There will be minor traffic interruptions. Appropriate traffic controls will be in place.

Oakland Court Development (Lokey Ave. and Academy St)

Expected Road Closures: Monday through Friday: As part of the Oakland Court development, Academy St will be closed to through traffic between Palm Ct and Hembree St. Lokey Ave will also be closed at Academy St. Appropriate traffic controls and detours will be in place.

.Warrior Drive Widening Project

Expected Lane Closures: Monday through Friday, 9:00 am to 3:00 pm: Incidental construction and utility work continues on Warrior Dr. There will be lane closures and traffic shifts. Appropriate traffic controls will be in place.

Underground Utility Work (Elam Farms Pkwy. just north of Joe B Jackson Pkwy.)

Expected Lane Closures: Monday through Friday, 8:30 am to 3:30 pm: Comcast crews will be installing underground fiber optics lines along Elam Farms Pkwy. There will be lane closures and traffic interruptions. Appropriate traffic controls will be in place.

Turn lane Installation Work (Butler Drive south of the railroad tracks)

Expected Road Closures: Monday through Friday: As part of a private development, the new left turn lane on Butler Dr will be paved and striped. Appropriate traffic controls and detours will be in place.

Underground Atmos Energy Gas Line Work (Compton Rd. between Jackson Rd. and Flower Park Drive)

Expected Lane Closures: Monday through Friday, 8:30 am to 3:30 pm: Atmos Energy crews will be installing underground gas lines along Compton Rd. There will be lane closures and traffic interruptions. Appropriate traffic controls will be in place.

Private Water and Sewer Line Tie-in Work (Brinkley Ave. between W College and NW Broad streets)

Expected Lane Closures: Wednesday through Friday, 8:30 am to 3:30 pm: Utility crews will be installing water and Sewer lines and tie-in work on Brinkley Ave. There will be lane closures and traffic interruptions. Appropriate traffic controls will be in place.

Mercury Blvd. Sidewalk Improvement Project SE Broad St. and Middle Tennessee Blvd.)

Expected Lane Closures: Monday through Friday, 9:30 am to 3:00 pm: Construction crews will be installing sidewalk and traffic signal improvements along the south side of Mercury Blvd. There will be lane closures and traffic interruptions. Appropriate traffic controls will be in place.

Private Development Improvements
1) Joe B Jackson Pkwy at Shelbyville Pike (right turn lane)
2) Shelbyville Pike at Highfield Dr (left turn lane)
3) Titans Circle (utility work)

Expected Lane Closures: Monday through Friday: As part of a private development, there will be right turn lane improvements at Joe B Jackson Pkwy and Shelbyville Pike, left turn lane improvements at Shelbyville Pike and Highfield Dr and utility improvements at Titans Cir. There will be lane closures and traffic interruptions. Appropriate traffic controls and will be in place.

Annual City Street Paving Projects

Expected Lane Closures: Monday through Friday, 9:00 AM – 3:00 PM: City contractor will be performing construction work at the following streets:
1. Public Dr, Shelby St, Mi-Tech Dr and Porter St (paving)
2. Tommy Martin at NW Broad St (handicap ramps)
3. Brinkley Rd near Wilkerson Downs Townhomes (storm drain work)
4. Saint Andrews Dr and Cason Ln (sidewalk repairs)
5. Highland Ave between E Main St and Clark Blvd (milling work)
Expect lane shifts and traffic interruptions. Appropriate traffic controls will be in place.

TDOT Resurfacing Projects

I -24 in RUTHERFORD COUNTY
I-24 from MM 74.00 - 74.00. On call concrete repairs at various locations. Fri 7/30 until Mon 8/2 continuous 8PM-5AM continuous. There will be a full closure of the I-24 WB exit 74A to I840 WB for concrete replacement.

I-840 in RUTHERFORD COUNTY
I-840 from MM 45.00 - 53.00. The resurfacing on I-840 including concrete ramp repair. Thurs 7/29 thru Thurs 8/5 and Fri 7/30 thru Mon 8/2 7PM-5AM Fri at 7PM-5AM on Monday continuous. There will be alternating lane closures for paving and shoulder stone operations. The exit ramp from I-840 WB to SR 102 (exit 47) will be closed for concrete ramp replacement.

I-840 from MM 59-61 The repair of bridges on I-840 over East Fork of the Stones River including approach slab replacement. On Tuesday 8/3 thru Thurs 8/5 there will be alternating lane closures for mobilizing equipment and restriping activities in preparation of weekend lane closure. LOOK AHEAD on Fri 8/6 thru Tues 8/3 There will be lane closures in both directions for bridge repair activities. One lane will remain open at all times.

I-840 EB & WB at MM 60 The grading, drainage, construction of two concrete Bulb-Tee beam bridges, signals and paving on SR 266 (Jefferson Pike) Thurs 7/29 thru Wed 8/4 The traffic will be shifted to the temporary ramp in in order to rebuild the existing ramp. The overall travel width will reduce from 28' to 12'.

Jefferson Pike in RUTHERFORD COUNTY
Jefferson Pike (SR 266) from LM 5.00 - 9.00. The grading, drainage, construction of two concrete Bulb-Tee beam bridges, signals and paving on SR 266 from SR 102  (Almaville Road/Nissan Drive) to east of I-840 from 9AM-3PM July 29 thru Wednesday, Aug. 4. There will be periodic flagging operation alone SR 266 for construction activities.

Sections: Other News